FESCO New Connection Application 2026 – Apply Online via Power Smart App
Applying for a new FESCO electricity connection in 2026 has become faster and more convenient. The old ENC portal has been discontinued, and all new connection services are now handled through the Power Smart Mobile App.
⚡ Important 2026 Update: ENC Portal Discontinued
FESCO officially discontinued its Electricity New Connection (ENC) portal and shifted all services to the Power Smart Mobile App to provide faster, more efficient digital facilities.
Applications submitted through the ENC portal up to March 31, 2026 are still being processed
From April 1, 2026 forward , all new connection applications must be submitted exclusively through the Power Smart Mobile App
All services continue to be available at customer service centers for consumers who face difficulty with online applications
📱 How to Apply for FESCO New Connection Online — Step by Step
Step 1: Download the Power Smart Mobile App
Step 2: Register on the App
Enter your CNIC and mobile number to register. The app allows you to update your personal information, including CNIC and mobile numbers, directly in the FESCO system.
Step 3: Apply for New Connection
Navigate to the New Connection section within the app
Select your connection type (Residential, Commercial, Industrial, Agricultural, or Temporary)
Fill in your personal details (name, father's name, CNIC, present address, contact number)
Enter your location details (GPS location or neighbor's bill reference number helps with verification)
Step 4: Upload Required Documents
Upload scanned copies of all required documents through the app.
Step 5: Pay Processing Fee (if applicable)
Pay the processing fee through JazzCash, EasyPaisa, bank transfer , or designated bank branches.
Step 6: Submit the Application
Read the terms and conditions
Check the "I Agree" box
Click "Submit" to send your application to FESCO
Save your tracking ID/application number for future reference
📄 Documents Required for FESCO New Connection
Basic Required Documents (All Connection Types)
Attested copy of witness CNIC (a neighbor with an active connection)
Property ownership proof (property tax receipt, allotment letter, or sale deed)
Copy of neighbor's FESCO bill (to assist with location identification)
Additional Documents for Commercial or Industrial Connections
📋 How to Track FESCO New Connection Status
You can track your application status 24/7 through the Power Smart Mobile App.
Common Status Messages Explained
| Status | Meaning |
|---|---|
| Pending Verification | FESCO has received your application and is verifying documents |
| Site Inspection Scheduled | A lineman will visit your property for inspection |
| Demand Notice Issued | FESCO has issued the fee estimate; download and pay it |
| Payment Verified | Your payment has been received and verified |
| Approved | Your connection has been approved; meter installation is pending |
| Connection Active | Your meter is installed and the connection is activated |
📜 What Is a FESCO Demand Notice?
A FESCO Demand Notice is an official fee statement showing the charges you need to pay before committing installation. This is not a bribe — it is a government-mandated estimate.
What Is Included in the Demand Notice?
Meter Testing Charges
Service Connection Charges
Meter Cost (approximately Rs. 25,000 for single-phase meters in 2025/2026)
Installation Labor Fee
GST on Services
How to Get and Pay Your Demand Notice
Download from the Power Smart Mobile App under "My Applications"
Review the total amount and check all details are correct
Pay at the designated bank mentioned on the demand notice (Habib Bank, Allied Bank, or National Bank of Pakistan)
Upload the paid receipt through the app
FESCO will verify your payment and continue with the connection process
🏠 Meter Installation Process After Payment
Site Verification
A FESCO lineman visits your property to verify:
Distance from the electric pole
Safe internal wiring
Load matches your appliances
This visit is free — do not pay any cash to the lineman.
Meter Installation and Connection Activation
After site verification, the Executive Engineer signs off on the approval. Meter installation is scheduled, and the connection is activated.
📈 FESCO New Connection Processing Time
Estimated Approval Times
| Area | Estimated Time |
|---|---|
| Major cities (Faisalabad) | 1 week |
| Remote areas (Chiniot) | Up to 1 month (due to transformer capacity issues) |
Total Processing Time
According to NEPRA regulations, for a complete application:
Common Reasons for Delays
Payment not updated in system
Dispute over property ownership
✅ What Happens After Your Connection Is Activated?
You will receive your first FESCO bill within 1–2 months
You can use the "Apna Meter, Apni Reading" feature on the Power Smart App to submit your own meter readings
Your bill will show the reading you submitted, along with a photograph of your meter
❓ Frequently Asked Questions
Can I apply for a new FESCO connection online?
Yes. Through the Power Smart Mobile App , which has replaced the ENC portal since April 1, 2026.
How long does a new FESCO connection take?
For residential connections, approval takes 7–15 days, followed by meter installation. Total processing is typically 28–45 days.
Can I track my application online?
Yes. Use the Power Smart Mobile App to track your application status.
What happens after paying the demand notice?
FESCO verifies your payment, conducts a site inspection, and then installs the meter and activates your connection.
Is the ENC system still available?
No. FESCO discontinued the ENC portal on April 1, 2026 . All services are now exclusively through the Power Smart Mobile App.
Can I apply without visiting the office?
Yes. The entire process can be completed online through the Power Smart Mobile App. Customer service centers are still available for those who need in-person assistance.
Related Guides
FESCO Online Bill Check – View your bill instantly
FESCO Bill Complaint Online – File and track complaints
FESCO Peak Hours Timing – Save on electricity bills by avoiding peak hours

Comments
Post a Comment